We offer a complete re-rig solution with wire, rod, composite rigging, and swaging rod re-heading. Rod DYE test is also available. Our service includes the mast un-step, strip, assemble, step, and static tune. A typical re-rig takes about five days, so y
1 New Beach Rd Darling Point, NSW 2027
(02) 8021 5124
https://ronirigging.com.au
Monday-Saturday: 9 AM–5 PM Sunday: Open 24 hours
Updated by:
RoniRiggingRacing at 2023-12-13 13:39:48 UTC